{"id":13314,"date":"2023-08-22T13:57:06","date_gmt":"2023-08-22T17:57:06","guid":{"rendered":"https:\/\/help.strongtietech.com\/pipeline\/?page_id=13314"},"modified":"2023-08-22T14:20:40","modified_gmt":"2023-08-22T18:20:40","slug":"pipeline-2023-2","status":"publish","type":"page","link":"https:\/\/help.strongtietech.com\/pipeline\/release-notes\/pipeline-2023-2\/","title":{"rendered":"Pipeline 2023.2"},"content":{"rendered":"<p>[vc_row row_type=&#8221;row&#8221; stretch_row_type=&#8221;no&#8221;][vc_column][vc_column_text]<\/p>\n<p class=\"newfeatures\">New Features<\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row row_type=&#8221;row&#8221; stretch_row_type=&#8221;no&#8221;][vc_column][vc_column_text]<\/p>\n<h3>Trades<\/h3>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row row_type=&#8221;row&#8221; stretch_row_type=&#8221;no&#8221;][vc_column][vc_column_text]Pipeline Purchasing and Scheduling users now can notify a Trade of scheduling only activity.\u00a0 Building Phases assign a Scheduling Task that allows the PO to be viewed, and a Scheduling Task that is the \u201cPayment\u201d task.\u00a0 Trades are also able to assign 1 to multiple Scheduling Task to a trade.<\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row row_type=&#8221;row&#8221; stretch_row_type=&#8221;no&#8221;][vc_column][vc_separator][\/vc_column][\/vc_row][vc_row row_type=&#8221;row&#8221; stretch_row_type=&#8221;no&#8221;][vc_column][vc_column_text]<\/p>\n<h3>Future &amp; Historical Bid Costs<\/h3>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row row_type=&#8221;row&#8221; stretch_row_type=&#8221;no&#8221;][vc_column width=&#8221;5\/6&#8243;][vc_column_text]Purchasing users are now able to set future Bid Costs due to constant cost changes.\u00a0 A Historic Cost button is added to Vendor Option Bid Costs and Option Bid Costs pages, in Pipeline Purchasing, that takes a user to a page to manage future bids and also see previous bid information.\u00a0 Manual edits of future bids are allowed.\u00a0 The import\/export of future bid including effective date is also allowable.<\/p>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/6&#8243;][vc_single_image image=&#8221;13317&#8243; onclick=&#8221;link_image&#8221;][\/vc_column][\/vc_row][vc_row row_type=&#8221;row&#8221; stretch_row_type=&#8221;no&#8221;][vc_column][vc_separator][\/vc_column][\/vc_row][vc_row row_type=&#8221;row&#8221; stretch_row_type=&#8221;no&#8221;][vc_column][vc_column_text]<\/p>\n<p class=\"enhancements\">Enhancements<\/p>\n<ul class=\"release\">\n<li>Pipeline Purchasing now gives the User the option to apply extra precision to the product costs of selected Vendors.\u00a0 Functionally, this allows for up to five decimal places when precision is enabled.\u00a0 If precision is not enabled the product cost can only be saved to two decimal places.\u00a0 PIPE-26169<\/li>\n<li>Purchasing users when assigning a custom option to a job, can also assign 1 or many one-time items to that custom option\/job combination.\u00a0 This allows production builders, with custom options, the ability to link a bid to a custom option.\u00a0 PIPE-29369<\/li>\n<li>The Bid Cost process user experience is updated to allow for negative costs on bid items wherever they are entered.\u00a0 This includes imports and all Pipeline UI interface.\u00a0 PIPE-29484<\/li>\n<li>The Pipeline Jobs pages are updated to show the address associated with All Jobs and Active Jobs.\u00a0 PIPE-30559<\/li>\n<li>Updates to the Pipeline Building Phase page create a better UI experience, page alignment and the usage of special characters.\u00a0 PIPE-32067<\/li>\n<li>Pipeline users can now search Trades via a drop-down list when assigning to a Vendor.\u00a0 PIPE-32996<\/li>\n<\/ul>\n<p class=\"fixes\">Fixes<\/p>\n<ul class=\"release\">\n<li>Previously, two different Phases were being added and deleted on Vendor Building Phases page.\u00a0 This is now fixed.\u00a0 PIPE-28276<\/li>\n<li>Within Pipeline Trades, there was previously no loading panel when adding Building Phases of a Trade.\u00a0 This is fixed to indicate the loading is in progress.\u00a0 PIPE-32196<\/li>\n<li>Within Trades, if a User hits \u201ccancel\u201d button during the Add process, the previously inputted data or entry is not retained on the Add modal.\u00a0 PIPE-32197<\/li>\n<li>The Copy Vendor modal is fixed to be consistent and aligned with all Pipeline pop-up modals.\u00a0 Additionally, a \u201ccancel\u201d button was added to the bottom right corner of modal.\u00a0 PIPE-32259<\/li>\n<li>Previously, the following remained in edit mode for pages that enable fields on general list view: Release Groups, Cost Codes, Cost Types, Cost Categories. This is now fixed.\u00a0 PIPE-32261<\/li>\n<li>When inputting an invalid value on Sort Order field, the page now displays an error toast message.\u00a0 Previously the error only displayed in the developer\u2019s tool console. \u00a0PIPE-32262<\/li>\n<li>Add modals within Vendors and Building Phase page of Trades are now consistent in appearance, functionality, and verbiage.\u00a0 PIPE-32263<\/li>\n<li>The Building Phase Overrides page, within Pipeline Vendors, would previously save non-numeric data.\u00a0 This is resolved.\u00a0 PIPE-32264<\/li>\n<li>Vendors can now be assigned as primary to multiple Trades.\u00a0 PIPE-32265<\/li>\n<li>Pipeline Purchasing is updated to remove references to Cutoff Phases.\u00a0 PIPE-32886<\/li>\n<li>Homefront API issues were found in Pipeline 2023.1 release.\u00a0 Homefront API calls are updated to be successful for House and Global BOM.\u00a0 PIPE-34697<\/li>\n<li>When trying to navigate between products in Pipeline Estimating, the User workstation appeared to lock up, creating PC stress and lagging response times.\u00a0 This is resolved so that a User can navigate to all Product section areas without PC performance concerns. PIPE-34862<\/li>\n<li>It was found that when importing House Quantities with a Custom Parameter, that Customer Parameter was not processed through to the final House Quantities page.\u00a0 This is resolved so that Custom Parameters are passed through the complete import Process.\u00a0 PIPE-34935<\/li>\n<li>The BIM file was not previously displayed on the Import\/Job page. This is fixed.\u00a0 PIPE-34979<strong>\u00a0<\/strong><\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"[vc_row row_type=&#8221;row&#8221; stretch_row_type=&#8221;no&#8221;][vc_column][vc_column_text] New Features [\/vc_column_text][\/vc_column][\/vc_row][vc_row row_type=&#8221;row&#8221; stretch_row_type=&#8221;no&#8221;][vc_column][vc_column_text] Trades [\/vc_column_text][\/vc_column][\/vc_row][vc_row row_type=&#8221;row&#8221; stretch_row_type=&#8221;no&#8221;][vc_column][vc_column_text]Pipeline Purchasing and Scheduling users now can notify a Trade of scheduling only activity.\u00a0 Building Phases assign a Scheduling Task that allows the PO to be viewed, and a Scheduling Task that is the \u201cPayment\u201d task.\u00a0 Trades are also able to assign 1 to [&hellip;]","protected":false},"author":346,"featured_media":0,"parent":705,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"template-page-full-width.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-13314","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/help.strongtietech.com\/pipeline\/wp-json\/wp\/v2\/pages\/13314","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/help.strongtietech.com\/pipeline\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/help.strongtietech.com\/pipeline\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/help.strongtietech.com\/pipeline\/wp-json\/wp\/v2\/users\/346"}],"replies":[{"embeddable":true,"href":"https:\/\/help.strongtietech.com\/pipeline\/wp-json\/wp\/v2\/comments?post=13314"}],"version-history":[{"count":0,"href":"https:\/\/help.strongtietech.com\/pipeline\/wp-json\/wp\/v2\/pages\/13314\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/help.strongtietech.com\/pipeline\/wp-json\/wp\/v2\/pages\/705"}],"wp:attachment":[{"href":"https:\/\/help.strongtietech.com\/pipeline\/wp-json\/wp\/v2\/media?parent=13314"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}